Lake Turkana Wind Power Road Upgrade Project – Soil Solutions

Soil Solutions was awarded the first phase of the internal Road Upgrades at the Lake Turkana Wind Power (LTWP) Project in Kenya.  Having already invested a significant amount in the initial road construction required to transport the 365  wind turbines throughout the 250 km wind farm, the roads now required an upgrade. In total 1095 blades spanning 55m and 365 tower measuring 36m travelled the gravel roads. Read more